Tailored to Your Voltage & Capacity Needs
Configurable from 18V to 36V with various cell options to match your power requirements.
| CELL MODEL (BRAND) | FORMAT | CAPACITY (MAH) | CONT. DISCHARGE | TYPICAL APPLICATION |
|---|---|---|---|---|
| Samsung INR18650-25R |
18650 | 2,500 | 20A (8C) | 18V packs (drills/drivers) - balanced power & runtime |
| Samsung INR21700-50S |
21700 | 2,000 | 30A (15C) | High-drain tools (impact wrenches/saws) - max power |
| Molicel INR21700-P42A | 21700 | 4,200 | 45A (≈10C) | 36V or 18V heavy-duty tools - extreme current |
| Sony/Murata VTC6 | 18650 | 3,000 | 15A (5C) | Higher capacity needs with moderate discharge |
| LG INR21700-M50LT | 21700 | 5,000 | 15A (3C) | Long-runtime industrial equipment |
Your Trusted B2B Partner
More than just a supplier – we provide end-to-end solutions from design to certification.
Comprehensive Safety Certifications
Products meet UN38.3, IEC62133, and UL1642 standards. We provide CE, RoHS, and MSDS documentation for smooth global customs clearance.
Rigorous Quality Control (QC)
We apply AQL standards. Every batch of cells is tested for voltage and resistance. Finished packs undergo cycling tests with ±2% batch consistency.
In-Depth OEM Engineering Support
From cell selection and BMS tuning to custom housing molds and branding labels, we offer one-stop engineering services.
Reliable Supply & Fast Delivery
1-2 weeks for prototypes, 3-4 weeks for mass production. Experienced in dangerous goods logistics for compliant air/sea shipping.
UN38.3
CE / RoHS
ISO 9001
Real-World Performance Success
See how our partners achieve market success with STEC battery solutions.
CHALLENGE
Competitors offered longer runtime; client needed to boost market competitiveness.
SOLUTION
STEC custom 5S2P pack (Samsung 35E/25R) with smart BMS.
25% longer runtime while maintaining high torque.
CHALLENGE
High current bursts caused overheating and shutdowns, affecting construction efficiency.
SOLUTION
10S1P pack with Molicel P42A cells & optimized MOSFET thermal design.
Zero overheating shutdowns; significantly reduced downtime.
CHALLENGE
Inconsistent battery quality, high return rates, and customs clearance issues.
SOLUTION
STEC provided fully certified, private-label packs.
40% reduction in QC issues & faster customs clearance.